1919 Maple Grove (D07-16-19-0018) - Development Tracker

1919 Maple Grove (D07-16-19-0018) #

Summary #

Application StatusPost Approval
Review StatusDraft Approved
DescriptionThe City of Ottawa has received a concurrent Plan of Subdivision and Zoning By-law Amendment application to permit the development of a residential subdivision comprised of 36 semi-detached dwellings, 36 back-to-back townhouses, a park block, and two blocks reserved for low-rise apartment buildings estimated at 460 units. In addition to the current applications, a separate site plan control application will be required before the apartment buildings can be constructed.
WardWard 6 - Glen Gower
Date Received2019-07-18
Status Updated2019-07-18

Files #

TypeNameLinks
Application Summary2019-08-21 - Application Summary - D07-16-19-0018Download PDF
Architectural Plans2023-07-17 - Pathways and Fencing Plan - D07-16-19-0018Download PDF
Architectural Plans2023-07-17 - Master Plan Option 4-R07 - D07-16-19-0018Download PDF
Architectural Plans2023-07-17 - Draft Plan of Subdivision - D07-16-19-0018Download PDF
Architectural Plans2021-04-20 - Site Plan Map - D07-16-19-0018Download PDF
Architectural Plans2021-04-20 - Site Plan - D07-16-19-0018Download PDF
Architectural Plans2021-04-20 - Draft Plan of Subdivision - D07-16-19-0018Download PDF
Architectural Plans2019-08-21- Civil Plans - D07-16-19-0018Download PDF
Architectural Plans2019-07-22 Site Plan D07-16-19-0018Download PDF
Architectural Plans2019-07-22 Draft Plan of Subdivision D07-16-19-0018Download PDF
Architectural Plans201-09-17 - Site Plan - D07-16-19-0018Download PDF
Existing Conditions2021-09-17 - Existing Residential Plan - D07-16-19-0018Download PDF
Geotechnical Report2023-07-17 - Geotechnical Investigation - D07-16-19-0018Download PDF
Geotechnical Report2021-04-20 - Geotechnical Investigation - D07-16-19-0018Download PDF
Noise Study2023-07-17 - Noise Control Feasibility Study - D07-16-19-0018Download PDF
Noise Study2019-07-22 Environmental Noise Assessment D07-16-19-0018Download PDF
Planning2021-04-20 - Planning Rationale - D07-16-19-0018Download PDF
Site Servicing2023-07-17 - Servicing and Stormwater Management Report - D07-16-19-0018Download PDF
Stormwater Management2021-09-17 - Functional Servicing and Stormwater Management Report - D07-16-19-0018Download PDF
Stormwater Management2021-04-20 - Functional Servicing and Stormwater Management Report - D07-16-19-0018Download PDF
Stormwater Management2019-08-21 - Functional Servicing and SWM Report - D07-16-19-0018Download PDF
Transportation Analysis2023-07-17 - TIA Addendum Memo - D07-16-19-0018Download PDF
Tree Information and Conservation2019-07-22 EIS and TCR D07-16-19-0018Download PDF
2024-07-19 - Delegated Authority Report - D07-16-19-0018Download PDF
2023-07-17 - Draft Proposed Roadway Modifications - D07-16-19-0018Download PDF
2021-09-17 - Residential Road Allowance - D07-16-19-0018Download PDF
2021-09-17 - Proposed Roadway Modifications - D07-16-19-0018Download PDF
2019-07-22 Transportation Impact Assessment D07-16-19-0018Download PDF
2019-07-22 Planning Rationale D07-16-19-0018Download PDF
2019-07-22 Phase 1 ESA D07-16-19-0018Download PDF
2019-07-22 Pavement Marking, Signage and Geometric D07-16-19-0018Download PDF
2019-07-22 Maple Grove Extension RMA D07-16-19-0018Download PDF
2019-07-22 Integrated Environmental Review D07-16-19-0018Download PDF
2019-07-22 Geotechnical Investigation D07-16-19-0018Download PDF