5651 First Line (D07-16-17-0017) - Development Tracker

5651 First Line (D07-16-17-0017) #

Summary #

Application StatusPost Approval
Review StatusAgreement Registered - Securities Held
DescriptionSituated in the Village of Manotick’s Mahogany Community, the subject site is located west of the now under construction Phase 1. Phase 2, 3 and 4 are bounded by Mahogany Creek (formerly the Unnamed Drain) to the east, Manotick Estates to the north, Century Road to the south, and future development lands to the west (First Line Road), The site is approximately 60.3 hectares in size and is predominately vacant; with the exception of a pumping station located in the north east corner of the site. The lands surrounding the site are identified as residential to the north and east, vacant lands to the west and vacant rural lands to the south. The proposed development includes the second, third and fourth phases of the Mahogany Community. The Owner is proposing on full municipal services 926 housing units, which is to include a mix of housing types with varying lot sizes, neighbourhood amenity areas, parks and open space, and a roadway network, with two (2) connections to Cen
WardWard 21 - David Brown
Date Received2017-07-10
Status Updated2017-07-10

Files #

TypeNameLinks
Architectural Plans2018-08-27 - Draft Plan of Subdivision - D07-16-17-0017Download PDF
Architectural Plans2018-06-06 - Grade Control and Drainage Plan - D07-16-17-0017Download PDF
Architectural Plans2018-06-06 - Draft Plan of Subdivision - D07-16-17-0017Download PDF
Architectural Plans2017-12-13 - Revised Concept Plan Nov 28, 2017 - D07-16-17-0017Download PDF
Architectural Plans2017-07-27 - Draft Plan of Subdivision - D07-16-17-0017Download PDF
Architectural Plans2017-07-27 - Conceptual Watermain Plan WM-2 - D07-16-17-0017Download PDF
Architectural Plans2017-07-27 - Conceptual Watermain Plan WM-1 - D07-16-17-0017Download PDF
Architectural Plans2017-07-27 - Conceptual Sanitary Drainage Plan SA-2 - D07-16-17-0017Download PDF
Architectural Plans2017-07-27 - Conceptual Sanitary Drainage Plan SA-1 - D07-16-17-0017Download PDF
Architectural Plans2017-07-27 - Conceptual Grading Plan GP-2 - D07-16-17-0017Download PDF
Architectural Plans2017-07-27 - Conceptual Grading Plan GP-1 - D07-16-17-0017Download PDF
Architectural Plans2017-07-27 - Conceptual Grading Plan EC-1 - D07-16-17-0017Download PDF
Environmental2017-07-27 - Environmental Impact Statement - D07-16-17-0017Download PDF
Geotechnical Report2018-06-06 - Grading Plan 2 - D07-16-17-0017Download PDF
Geotechnical Report2018-06-06 - Grading Plan 1- D07-16-17-0017Download PDF
Geotechnical Report2017-07-27 - Groundwater Impact Study - D07-16-17-0017Download PDF
Geotechnical Report2017-07-27 - Geotechnical Study - D07-16-17-0017Download PDF
Noise Study2023-05-17 - Noise study Phase 2A & 2B - D07-16-17-0017Download PDF
Planning2018-08-27 - Planning Rationale - D07-16-17-0017Download PDF
Planning2018-06-06 - Planning Rationale - D07-16-17-0017Download PDF
Planning2017-07-27 - Planning Rationale - D07-16-17-0017Download PDF
Site Servicing2018-06-06 - Site Servicing Study and Brief Appendices- D07-16-17-0017Download PDF
Site Servicing2018-06-06 - Site Servicing Study and Brief - D07-16-17-0017Download PDF
Site Servicing2018-06-06 - Site Servicing Plan 4 - D07-16-17-0017Download PDF
Site Servicing2018-06-06 - Site Servicing Plan 3 - D07-16-17-0017Download PDF
Site Servicing2018-06-06 - Site Servicing Plan 2 - D07-16-17-0017Download PDF
Site Servicing2018-06-06 - Site Servicing Plan 1 - D07-16-17-0017Download PDF
Site Servicing2017-07-27 - Site Servicing Study Appendices - D07-16-17-0017Download PDF
Site Servicing2017-07-27 - Site Servicing Study - D07-16-17-0017Download PDF
Stormwater Management2018-06-06 - Stormwater Site Management Report 2 - D07-16-17-0017Download PDF
Stormwater Management2018-06-06 - Stormwater Site Management Report 1- D07-16-17-0017Download PDF
Stormwater Management2017-07-27 - Conceptual Storm Drainage Plan ST-2 - D07-16-17-0017Download PDF
Stormwater Management2017-07-27 - Conceptual Storm Drainage Plan ST-1 - D07-16-17-0017Download PDF
Transportation Analysis2018-06-06 - Transportation Impact Study and Brief - D07-16-17-0017Download PDF
2017-07-27 - Wilson Cowan Drain Fluvial Geomorphic Existing Conditions - D07-16-17-0017Download PDF
2017-07-27 - Community Transportation Study - D07-16-17-0017Download PDF