945 Bank/1015 Bank (D07-12-24-0178) - Development Tracker

945 Bank/1015 Bank (D07-12-24-0178) #

Summary #

Application StatusActive
Review StatusOn Circulation; Initial Submission Review
DescriptionNew north side stadium stands will be constructed in place of the existing stadium stands, part of Lansdowne 2.0 project.
WardWard 17 - Shawn Menard
Date Received2024-12-24
Status Updated2024-12-24

Files #

TypeNameLinks
Application Summary2025-02-21 - Application Summary - D07-12-24-0178Download PDF
Architectural Plans2025-01-23 - Site Plan & Elevations - D07-12-24-0178Download PDF
Architectural Plans2024-12-24 - Construction Management Plan - D07-12-24-0178Download PDF
Architectural Plans2024-12-24 - Architectural Plans - D07-12-24-0178Download PDF
Architectural Plans2024-12-24 - Appendix E - Site Servicing Plan - D07-12-24-0178Download PDF
Architectural Plans2024-12-24 - Appendix D - Grading and Drainage Plans - D07-12-24-0178Download PDF
Architectural Plans2024-12-24 - Appendix C - Landscape Plan - D07-12-24-0178Download PDF
Architectural Plans2024-12-24 - Appendix B - Elevations - D07-12-24-0178Download PDF
Architectural Plans2024-12-24 - Appendix A - Site Plan - D07-12-24-0178Download PDF
Civil Engineering Report2025-01-23 - Civil Plans - North Side Stands - D07-12-24-0178Download PDF
Civil Engineering Report2025-01-23 - Civil Plans - Event Centre - D07-12-24-0178Download PDF
Civil Engineering Report2024-12-24 - Civil Plans - D07-12-24-0178Download PDF
Design Brief2025-01-10 - Urban Design Review Panel Report - D07-12-24-0178Download PDF
Design Brief2024-12-24 - Urban Design Brief - D07-12-24-0178Download PDF
Design Brief2025-03-06 - Urban Design Brief NNS - D07-12-24-0178Download PDF
Design Brief2025-03-25 - Urban Design Review Panel Recommendations - D07-12-24-0178Download PDF
Environmental2025-01-23 - Phase II ESA - North Side Stands - D07-12-24-0178Download PDF
Environmental2024-12-24 - Phase Two ESA - D07-12-24-0178Download PDF
Environmental2024-12-24 - Phase One ESA - D07-12-24-0178Download PDF
Floor Plan2024-12-24 - Appendix B - Overall Floor Plans - D07-12-24-0178Download PDF
Geotechnical Report2024-12-24 - Geotechnical Investigation - D07-12-24-0178Download PDF
Landscape Plan2024-12-24 - Landscape Plans - D07-12-24-0178Download PDF
Planning2025-01-23 - Zoning Confirmation Report - D07-12-24-0178Download PDF
Planning2024-12-24 - Zoning Confirmation Report - D07-12-24-0178Download PDF
Shadow Study2025-01-23 - Shadow Study - D07-12-24-0178Download PDF
Shadow Study2024-12-24 - Appendix F - Shadow Analysis - D07-12-24-0178Download PDF
Site Servicing2025-01-23 - Servicing Report - North Side Stands - D07-12-24-0178Download PDF
Site Servicing2024-12-24 - Servicing Report - D07-12-24-0178Download PDF
Stormwater Management2025-01-23 - SWM Report - Event Centre - D07-12-24-0178Download PDF
Surveying2025-01-23 - TOPO Sketch - D07-12-24-0178Download PDF
Surveying2024-12-24 - TOPO Sketch - D07-12-24-0178Download PDF
Transportation Analysis2024-12-24 - Transportation Impact Assessment - D07-12-24-0178Download PDF
Tree Information and Conservation2025-01-23 - Landscape & TCR - D07-12-24-0178Download PDF
Tree Information and Conservation2024-12-24 - Tree Conservation Plans - D07-12-24-0178Download PDF
2025-02-19 - North Side Stands Parking Layout - D07-12-24-0178Download PDF
2024-12-24 - Appendix H - Heritage Impact Assessment - D07-12-24-0178Download PDF
2024-12-24 - Appendix G - Wind Analysis - D07-12-24-0178Download PDF