930 Somerset/1010 Somerset/1030 Somerset (D02-02-25-0015) - Development Tracker

930 Somerset/1010 Somerset/1030 Somerset (D02-02-25-0015) #

Summary #

Application StatusActive
Review StatusComment Period has Ended/Issue Resolution
DescriptionThe amendment is requesting the following: 1. Rezone the existing Plant Recreation Centre and Plouffe Park from L1 to L2[XXX] Zone 2. Rezone the proposed school site and new parklands from existing MC to L2[XXX] Zone 3. Rezone the proposed Recreation, Cultural, and Facility Services (RCFS) from the existing MC to L2[XXX], and 4. Establish site-specific provisions through a new L2 special exception zone. 5. Rezone the proposed future residential from existing IG1 H(11) to MC Zone. 6. Remove FSI cap from existing MC FSI(1.5) Zone.
WardWard 14 - Ariel Troster
Date Received2025-03-05
Status Updated2025-03-05

Files #

TypeNameLinks
Adequacy Of Public Services2025-03-05 - Adequacy of Servicing - D02-02-25-0015Download PDF
Application Summary2025-03-26 - Application Summary Approved - D02-02-25-0015Download PDF
Application Summary2025-03-27 - Updated Application Summary - D02-02-25-0015Download PDF
Architectural Plans2025-03-05 - Sanitary Drainage Plan - D02-02-25-0015Download PDF
Architectural Plans2025-03-05 - Plan 4R-34981 - D02-02-25-0015Download PDF
Architectural Plans2025-03-05 - Plan 4R-34716 - D02-02-25-0015Download PDF
Architectural Plans2025-03-05 - Plan 4R-28806 - D02-02-25-0015Download PDF
Architectural Plans2025-03-05 - Plan 4R-26830 - D02-02-25-0015Download PDF
Architectural Plans2025-03-05 - Plan 4R-13627 - D02-02-25-0015Download PDF
Architectural Plans2025-03-05 - Concept Plan - D02-02-25-0015Download PDF
Design Brief2025-03-05 - Urban Design Review Panel Report - D02-02-25-0015Download PDF
Design Brief2025-03-05 - Urban Design Review Panel Report - D02-02-25-00151Download PDF
Environmental2025-03-05 - Phase Two Environmental Site Assessment - D02-02-25-0015Download PDF
Environmental2025-03-05 - Phase One Environmental Site Assessment - D02-02-25-0015Download PDF
Erosion And Sediment Control Plan2025-03-05 - Erosion Control Plan - D02-02-25-0015Download PDF
Existing Conditions2025-03-05 - Existing Conditions Storm Drainage Plan - D02-02-25-0015Download PDF
Existing Conditions2025-03-05 - Existing Conditions and Removals Plan - D02-02-25-0015Download PDF
Geotechnical Report2025-03-05 - Grading Plan - D02-02-25-0015Download PDF
Geotechnical Report2025-03-05 - Geotechnical - D02-02-25-0015Download PDF
Landscape Plan2025-03-05 - Landscape Concept Plan - D02-02-25-0015Download PDF
Noise Study2025-03-05 - Noise and Vibration Feasibility Study - D02-02-25-0015Download PDF
Planning2025-03-05 - Planning Rationale - D02-02-25-0015Download PDF
Site Servicing2025-03-05 - Site Servicing Plan - D02-02-25-0015Download PDF
Stormwater Management2025-03-05 - Storm Drainage Plan - D02-02-25-0015Download PDF
Transportation Analysis2025-03-05 - Transportation Impact Assessment - D02-02-25-0015Download PDF
Tree Information and Conservation2025-03-05 - Tree Assessment - D02-02-25-0015Download PDF
2025-03-05 - Heritage Impact Assessment - D02-02-25-0015Download PDF