1927 Maple Grove (D02-02-21-0119) - Development Tracker

1927 Maple Grove (D02-02-21-0119) #

Summary #

Application StatusInactive
Review StatusZoning By-law in Effect
DescriptionThe amendment is needed to permit residential development on rhe lands. The requested changed zone is Residential Third Density subzone YY with site specific exemptions to permit: A minimum corner side yard setback of 2.5 meters, where as a minimum of 4.5 meters is required; A minimum lot width of 5.8 meters, where a minimum of 6.0 meters is required and A minimum front yard setback of 5.2 metres, whereas a minimum of 6.0 meters is required.
WardWard 6 - Glen Gower
Date Received2021-10-13
Status Updated2021-10-13

Files #

TypeNameLinks
Adequacy Of Public Services2022-12-16 - Assessment of Adequacy of Public Services - D02-02-21-0119Download PDF
Adequacy Of Public Services2022-10-04 - Assessment of Adequacy of Public Services - D02-02-21-0119Download PDF
Adequacy Of Public Services2021-10-13 - Assessment of Adequacy - D02-02-21-0119Download PDF
Application Summary2021-11-05 - Application Summary - D02-02-21-0119Download PDF
Archaelogical Assessment2021-10-13 - Stage 1 and 2 Archaeological Assessment - D02-02-21-0119Download PDF
Architectural Plans2022-12-16 - Site Plan - D02-02-21-0119Download PDF
Architectural Plans2022-10-04 - Site Plan - D02-02-21-0119Download PDF
Architectural Plans2021-10-13 - Site Plan - D02-02-21-0119Download PDF
Architectural Plans2021-10-13 - Elevations Exterior - D02-02-21-0119Download PDF
Architectural Plans2021-10-13 - Elevations 2 - D02-02-21-0119Download PDF
Architectural Plans2021-10-13 - Draft Plan of Subdivision - D02-02-21-0119Download PDF
Environmental2021-10-13 - Phase 1 Environmental Site Assessment - D02-02-21-0119Download PDF
Environmental2021-10-13 - Environmental Impact Statement - D02-02-21-0119Download PDF
Geotechnical Report2022-10-04 - Grading Plan - D02-02-21-0119Download PDF
Geotechnical Report2022-10-04 - Geotechnical Investigation - D02-02-21-0119Download PDF
Geotechnical Report2021-10-13 - Grading Plan - D02-02-21-0119Download PDF
Geotechnical Report2021-10-13 - Geotechnical - D02-02-21-0119Download PDF
Landscape Plan2022-12-16 - Landscape Plan - D02-02-21-0119Download PDF
Landscape Plan2022-10-04 - Landscape Plan - D02-02-21-0119Download PDF
Noise Study2021-10-13 - Noise Control Feasibility Study - D02-02-21-0119Download PDF
Planning2021-10-13 - Planning Rationale - D02-02-21-0119Download PDF
Site Servicing2022-10-04 - Servicing Plan - D02-02-21-0119Download PDF
Site Servicing2021-10-13 - Site Servicing Plan - D02-02-21-0119Download PDF
Surveying2022-12-16 - Plan of Survey - D02-02-21-0119Download PDF
Surveying2021-10-13 - Topographical - D02-02-21-0119Download PDF
Tree Information and Conservation2022-12-16 - Tree Conservation Report - D02-02-21-0119Download PDF
Tree Information and Conservation2021-10-13 - Tree Conservation Report - D02-02-21-0119Download PDF
2022-10-04 - Turning Movements - D02-02-21-0119Download PDF