70 Beech St./75 Norman St. (D02-02-19-0031)

70 Beech St./75 Norman St. (D02-02-19-0031) #

Summary #

Application StatusFile Pending
Review StatusApplication File Pending
DescriptionTo amend the required the rear-yard and side-yard setbacks, rear-yard angular plane, visitor parking space requirements and aisle width provisions for a new six-storey mixed-use building fronting on Beech. The applicant also seeks permission for an enclosed rooftop amenity area not to be included in the overall height of the building.
WardWard 14 - Ariel Troster
Date Initiated2019-03-28
Last Updated2019-06-07

Renders #

Location #

Select a marker to view the address.

Site and Floor Plans #

Documents #

TypeDocument
Application Summary2019-05-07 - Application Summary - D02-02-19-0031
Architectural Plans2019-03-28 - Site Plan - D02-02-19-0031
Architectural Plans2019-03-28 - Elevations - D02-02-19-0031
Design Brief2019-10-28 - Design Brief - Urban Design Review Panel - D02-02-19-0031
Environmental2019-03-28 - Phase II ESA - D02-02-19-0031
Environmental2019-03-28 - Phase I ESA - D02-02-19-0031
Erosion And Sediment Control Plan2019-03-28 - Erosion Control Plan - D02-02-19-0031
Existing Conditions2019-03-28 - Existing Conditions - D02-02-19-0031
Floor Plan2019-03-28 - Floor Plan - D02-02-19-0031
Geotechnical Report2019-03-28 - Grading Plan - D02-02-19-0031
Geotechnical Report2019-03-28 - Geotechnical Report - D02-02-19-0031
Landscape Plan2019-03-28 - Landscape Plan - D02-02-19-0031
Noise Study2019-03-28 - Traffic Noise Report - D02-02-19-0031
Planning2019-03-28 - Planning Rationale - D02-02-19-0031
Rendering2019-03-28 - Perspectives - D02–02-19-0031
Shadow Study2019-03-28 - Sun Shadow Study - D02-02-19-0031
Site Servicing2019-03-28 - Servicing Report - D02-02-19-0031
Site Servicing2019-03-28 - Servicing Plan - D02-02-19-0031
Stormwater Management2019-03-28 - Stormwater Plan - D02-02-19-0031
Surveying2019-03-28 - Survey - D02-02-19-0031