101 Wurtemburg (D02-02-11-0023)

101 Wurtemburg (D02-02-11-0023) #

Summary #

Application StatusFile Pending
Review StatusApplication File Pending
DescriptionThe proposed development includes demolishing the existing dwelling and constructing a 13-storey residential building with 36 dwelling units. The Zoning Amendment proposes to remove the existing Floor Space Index of 2.5 and replace it with a maximum height limit of 45 metres, reduce visitor parking space requirements to 0, to permit a reduced driveway width of 4 metres to access the parking garage and to reduce the setback to a watercourse. The building will provide pedestrian access from a lobby fronting onto Wurtemburg Street. Underground parking is proposed with a total of 18 parking spaces. Access to the parking area will be provided from Wurtemburg Street. As part of the excavation for the building’s basement, the unstable slope adjacent to the river will be removed and reconstructed as a reinforced Mechanically Stabilized Earth system. The face of the reconstructed slope will use topsoil as a medium to support the re-vegetation of the slope. A landscape plan has been submi
WardWard 12 - Stéphanie Plante
Date Initiated2011-04-04
Last Updated2016-06-03

Documents #

TypeDocument
Architectural PlansSite Plan D02-02-11-0023
Architectural PlansD02-02-11-0023 (Rev May 2016) Site Servicning Plan
Architectural PlansD02-02-11-0023 (Rev May 2016) Site Plan
Architectural PlansD02-02-11-0023 (Rev May 2016) Parking Garage Plan 3
Architectural PlansD02-02-11-0023 (Rev May 2016) Parking Garage Plan 2
Architectural PlansD02-02-11-0023 (Rev May 2016) Parking Garage Plan 1
Architectural PlansD02-02-11-0023 (Rev May 2016) Architectual Building Elevation Drawings 2
Architectural PlansD02-02-11-0023 (Rev May 2016) Architectual Building Elevation Drawings
EnvironmentalEnvironmental Site Assessment - Phase I D02-02-11-0023
EnvironmentalEnvironmental Impact Statement - Part 7 D02-02-11-0023
EnvironmentalEnvironmental Impact Statement - Part 6 D02-02-11-0023
EnvironmentalEnvironmental Impact Statement - Part 5 D02-02-11-0023
EnvironmentalEnvironmental Impact Statement - Part 4 D02-02-11-0023
EnvironmentalEnvironmental Impact Statement - Part 3 D02-02-11-0023
Erosion And Sediment Control PlanErosion and Sediment Control Plan D02-02-11-0023
Geotechnical ReportGrading Plan D02-02-11-0023
Geotechnical ReportGeotechnical Study - Slope Stability Study D02-02-11-0023
Landscape PlanLandscape Plan D02-02-11-0023
PlanningPlanning Rationale D02-02-11-0023
Shadow StudySun Shadow Study D02-02-11-0023
Shadow StudyD02-02-11-0023 (Rev May 2016) Shadow Study
Site ServicingAssessment of Adequacy of Public Services - Site Servicing Study D02-02-11-0023
Stormwater ManagementStormwater Site Plan D02-02-11-0023
Stormwater ManagementStormwater Site Management Report D02-02-11-0023
Stormwater ManagementD02-02-11-0023 (Rev May 2016) Stormwater Management Plan
SurveyingD02-02-11-0023 (Rev May 2016) Survey Plan
D02-02-11-0023 (Rev May 2016) Site Servicing Brief
D02-02-11-0023 (Rev May 2016) Planning Rationale
D02-02-11-0023 (Rev May 2016) Phase 1 Environmental Assesment
D02-02-11-0023 (Rev May 2016) Grade Control & Drainage
D02-02-11-0023 (Rev May 2016) Geotechnical Study Memo